Slow bid / no-bid calls
The decision waits on inputs nobody owns, so effort goes to tenders you should have walked away from.
The bid-to-contract system of record for EPC
One signed thread from tender clause to approved price, contract obligation and performance test.
Water & Wastewater · Modular & Electrical · General EPC


The missing system
Scope, price, risk and promises — agreed in weeks, then scattered across folders, spreadsheets and inboxes.
Records the opportunity: client, value, due date.
Records the project: cost codes, POs, progress.
The real impact
When bid information is scattered, critical decisions get missed — and the cost shows up later.
The decision waits on inputs nobody owns, so effort goes to tenders you should have walked away from.
Requirements buried in volume 3 never reach the BOQ, and the gap surfaces on site.
Guarantees, LDs and time bars are agreed in the rush to submit, then discovered in delivery.
The contract drifts from the bid, the project team never sees the assumptions, and the claim has no evidence.
Where bidPlan sits
Most bid software owns one moment of the tender. bidPlan takes the tender in from the services you already pay for, and hands the contract you actually bid to the system that runs the project.
How bidPlan works
Every requirement, quantity, assumption and deviation becomes a record with an owner and a source page. Follow any clause forward to the price and the contract, or any obligation back to the tender that created it.
When the client's draft contract arrives, bidPlan compares it clause by clause with what you bid and negotiated. Drift is flagged before you sign, not after the first claim.
The platform
From the day a tender lands to final O&M handover.
Every gate reads from the same record: eligibility evidence, levelled quotes, the risk register, contract redlines.
Eligibility, fit, capacity and risk scored with evidence. Signed by the BD Head and MD.

Take-off, levelled vendor quotes, contingency and lifecycle cost in one build-up. Signed by Commercial and the MD.

Compliance matrix and volumes drafted from the record, with envelope-B prices visible only to the roles you name.

Redlines against the negotiated position, back-to-back checks and an obligations register with time bars.

Performance-test readings logged against the guarantee that was bid; FAT and SAT on the same thread.
Your own competitor prices, win/loss reasons and lessons go to your private knowledge bank.
What the AI does
bidPlan's AI reads the whole tender pack, drawings included, and writes findings to the record with the page they came from. Nothing reaches the price or the contract until a named person accepts it.
Scope, exclusions, deadlines, qualification criteria and deliverables, one atomic item each.
LDs, guarantees, time bars, payment terms and conflicts between volumes and corrigenda.
Drawing and schedule evidence lined up with BOQ lines, gaps called out for the estimator.
Sub-RFQ replies compared on scope, exclusions and price, then carried into the client price.
Drafted from the approved record, so the proposal says what the team decided.
A clause-by-clause drift report against what you bid, qualified and negotiated.
Industry packs
Each pack configures the project types, roles, screens and checks your bid team already works with: MLD and PG tests, kV and FAT, or chainage, BOQ bills and land handover.
STP, WTP, ETP and ZLD, desalination, reuse, pumping and networks, under EPC, DBO, HAM and long-term O&M.
Switchgear and switchrooms, eHouses, modular substations, power modules and skids.
Roads and highways, bridges and interchanges, rail and metro civil, tunnels, urban, port and airside works, under EPC, design & build and item-rate contracts.
Why bidPlan
EPC bids are decided by quantities, guarantees, prices and contract terms. That is what bidPlan structures, and what it carries past the award.
Business case
Most bid tools justify themselves in hours saved. In EPC the larger number is margin: a guarantee priced right, a deviation not given away, a drift caught before signature. Start with your own pipeline.
Open the full ROI calculatorGetting started
Users, roles and your industry pack configured; past RFQs and proposals imported to your knowledge bank.
Bid / no-bid scoring, compliance rules, approval gates and drafting tuned to how your team bids.
Your team takes a real opportunity from intake to submission on bidPlan, with us alongside.
Bring one live tender
We take your documents through tender summary, bid / no-bid, compliance extraction, BOQ review and contract-risk flags, and walk your team through the result.
Home / Platform
The platform
bidPlan keeps every clause, quantity, price and promise of an EPC bid on one signed thread, and holds the client contract and the guarantee to the bid you priced.
The record
A bidPlan record is the opportunity's single source of truth. Every item links back to the tender page that created it and forward to the decisions that used it.
The thread
Pick a sector. Each card is a record in bidPlan; the first and the last are the ones that cost money if they disagree.
Stages and gates
Stages organise the work; gates are the decisions. A gate cannot be signed until the record holds the evidence it needs, and every signature is logged with name and time.
Eligibility evidence, strategic fit, capacity and risk, scored against your own playbook. The scorecard shows the tender pages behind each score.
Take-off against the client BOQ, levelled vendor quotes, contingency, escalation and lifecycle cost in one build-up. Every number opens to its source.
Compliance matrix, technical annexures and commercial volume drafted from the record. Open items block release until they are closed or qualified.
Redlines against the negotiated position, back-to-back checks on subcontracts, and an obligations register with time bars, handed to delivery under the same ID.
Trial-run and performance-test readings logged against the guarantee in the bid, with FAT and SAT records filed to the same thread.
Your own competitor prices, win/loss reasons and lessons written to your knowledge bank, ready for the next tender of the same kind.
Select a gate to see what it decides and who signs it.
Envelope control
In two-envelope tenders, envelope B should be seen by a handful of people. bidPlan sets price visibility per bid and per role, and logs every time someone opens it.
Contract and obligations
When the client's draft contract arrives, bidPlan reads it against what you bid, qualified and negotiated, then hands delivery an obligations register that traces every duty to the bid item behind it.
Clause-by-clause differences between the draft contract and your qualifications, with the bid record that supports your position.
Vendor and subcontract terms checked against the owner's: guarantees, LDs, warranty periods and payment terms.
Every duty with its owner, time bar and notice period, so claims are filed on time and with evidence.
Guarantee values from the bid, readings from the test, deductions calculated before anyone argues about them.
Knowledge bank
Every closed bid adds to a knowledge bank that only your company can see: the price you submitted, the winning price when it is published, the reasons you won or lost, the clauses that caused trouble, and the vendor quotes that held.
Past RFQs and proposals imported in week one
Your own competitor prices and win/loss reasons, per tender type
Approved boilerplate and technical write-ups, by sector pack
Clause history: what you accepted, qualified and lost money on
Vendor performance: quotes, deliveries and guarantees that held
Integrations
bidPlan sits between the systems you run today. Connector status is shown honestly: what works now, and what is on the roadmap.
Bring the tender services you already use: CPPP / eProcure, GeM, state e-procurement portals, Etimad, Dubai eSupply, World Bank and ADB notices. Tender packs upload as PDF, Word, Excel, DWG and DXF.
Upload: availableFeeds: roadmapMicrosoft Entra ID single sign-on
AvailablePrimavera P6 · Oracle Aconex · Bentley ProjectWise · SharePoint
RoadmapSAP S/4HANA · Oracle Fusion · Microsoft Dynamics 365
RoadmapCompliance matrix, proposal volumes and registers to Word, Excel and PDF
AvailableStatus labels are set from the current product build. Ask for the connector list for your stack during the readout.
See it on your own tender
Tender summary, bid / no-bid scorecard, compliance extraction, BOQ review and contract-risk flags, each with its source page.
Discuss your tenderHome / Industry packs / Water & Wastewater
For EPC contractors bidding treatment plants, desalination, reuse and networks under EPC, DBO, HAM and long-term O&M contracts.
The tenders you bid
A water bid prices construction, process performance and often 15 years of operation in one number. The guarantee you accept in week two is the test you face in year two.
STP, WTP, CETP and ETP, including ZLD and tertiary treatment for reuse.
SWRO and brackish-water plants, intakes, outfalls and post-treatment.
Pumping stations, transmission mains, distribution and sewer networks.
EPC, DBO, hybrid annuity (HAM) and long-term O&M, often with two-envelope submission.
What the pack configures
One clause, followed
Each card is a record in bidPlan with an owner and a source page.
Where water bids lose margin
Design loads change by corrigendum or site data. bidPlan keeps the basis you priced and the answer that set it.
Energy, chemicals and staffing for 15 years sit in the same estimate as the plant, approved together at G2.
Performance deduction formulas are extracted and priced as risk before submission.
The guarantee from the bid is the value the test is logged against, with the trail to prove it.
Water & Wastewater
Requirements, guarantee and deduction clauses, BOQ gaps and contract-risk flags, each with its source page.
Discuss your tenderHome / Industry packs / Modular & Electrical
For switchgear makers, modular integrators and electrical EPCs bidding eHouses, switchrooms, modular substations and power modules to EPCs, owners and utilities.
The tenders you bid
Modular & electrical bids are getting faster and larger. The price depends on the bay you can book, the materials you can hedge and the tests you can pass on schedule.
Skid-mounted power modules, MV and LV switchboards, UPS rooms and busway for industrial and infrastructure sites.
eHouses, prefabricated switchrooms, control rooms and skids.
Modular and containerised substations, transformers and protection panels.
EPC contractors, owners and developers, often under framework or repeat-order terms.
What the pack configures
One clause, followed
Each card is a record in bidPlan with an owner and a source page.
Where electrical bids lose margin
Price-variation terms are extracted and priced, so the material price risk is a decision, not a surprise.
Bay capacity is checked against the programme before G2, not after award.
Delay damages linked to energisation, not delivery, are flagged as deviations.
Type tests and witness requirements become BOQ items with an owner.
Early access
Early-access customers run live bids on the pack and decide which calculators and checks we build next.
Join early accessHome / Industry packs / General EPC
For EPC and main contractors, design-builders, construct-only contractors and PMCs bidding roads, bridges, rail and metro civil works, tunnels, urban, port and airside infrastructure.
The tenders you bid
Infrastructure bids are won at L1 and lost on site: on quantities that were never surveyed, land that was never handed over, and damages capped higher than anyone priced.
Expressways, highways and widening; flyovers, interchanges, river and rail-over bridges.
Metro viaducts, station civil, track formation, road and rail tunnels, underpasses and shafts.
Drainage, utilities and junctions; berths, jetties and breakwaters; runways, taxiways and aprons.
EPC lump-sum turnkey, design & build, construct-only item rate, EPCM / PMC, and framework or HAM / PPP packages.
What the pack configures
General EPC runs on the same record, gates and roles as every pack, without industry calculators. Project types set the templates, benchmarks and past-bid comparisons.
One clause, followed
Each card is a record in bidPlan with an owner and a source page.
Where infrastructure bids lose margin
Earthwork and structures are taken off from survey levels, so the BOQ gap is priced before G2, not found on site.
Handover terms are extracted and tied to the programme, and a missing date becomes a deviation.
Borehole logs are linked to the piers they sit under, and longer piles become a priced assumption.
Delay damages and defects liability are checked back-to-back with girder, bearing and joint suppliers.
Pilot programme
We are looking for infrastructure EPCs and design-builders with a live road, bridge, rail or urban tender in the next six months. You run it on bidPlan; we tune the templates and checks around your bid.
One live tender, a bid lead, and two or three past bids for the knowledge bank
The full platform for the pilot, a configured pack, and a say in what we build next
General EPC pilot
Tell us about the tender and your bid team. We will reply with a pilot plan within two working days.
Apply as a pilot partnerHome / Roles
Who works in it
A bid is a team sport across eight functions. Each gets its own workspace on the same record, with edit rights by role, so nobody re-keys a number and nobody works from last week's copy.
Eight desks
Each desk works in its own space on the same bid. Scroll to walk through all eight: what each one owns and which gates it signs.
Pipeline from tender feeds, fit scoring and the bid / no-bid call. Sign G1 and G2 with the evidence in front of them.
Requirements, clarifications, compliance matrix, open items and submission. Releases the offer at G3.
Design basis, sizing calculators and technical annexures. Accept or qualify each technical requirement.
Take-off against the client BOQ, cost build-up and assumptions, versioned and owned. Builds costs without seeing final margin.
Sub-RFQs, quote levelling, long-lead plan and award advice. Vendor quotes flow into the client price, not a separate sourcing tool.
Margin, envelope-B pricing, BAFO rounds and the walk-away point, recorded before the meeting.
Clause redlines, the drift report, back-to-back checks and the obligations register. Co-sign G4.
Receives the baseline with every assumption, runs the performance test against the bid and signs G4 to G6.
Who signs what
The default sign-off map. Your playbook can change it in week two of onboarding.
What changes for each desk
TodayMD signs a price from a summary slide
On bidPlanMD signs G2 with every quantity and quote one click away
TodayBid Manager tracks open items in a spreadsheet
On bidPlanOpen items block release until closed or qualified
TodayEstimator's assumptions live in his workbook
On bidPlanAssumptions are records with an owner and a version
TodayContracts sees the bid for the first time at award
On bidPlanContracts reviews deviations at G1 and the drift report at G4
TodayProject Director inherits a PDF and a handshake
On bidPlanProject Director inherits the baseline, obligations and guarantees
MD signs a price from a summary slide
MD signs G2 with every quantity and quote one click away
Bid Manager tracks open items in a spreadsheet
Open items block release until closed or qualified
Estimator's assumptions live in his workbook
Assumptions are records with an owner and a version
Contracts sees the bid for the first time at award
Contracts reviews deviations at G1 and the drift report at G4
Project Director inherits a PDF and a handshake
Project Director inherits the baseline, obligations and guarantees
See your team on it
Weeks 3 and 4 of onboarding are a live bid, with every desk working on the same record and us alongside.
Discuss your tenderHome / Platform / What the AI does
What the AI does
bidPlan's AI works through tender packs of 2,000 pages and more, drawings included. Every finding carries the page it came from, and nothing reaches the price or the contract until a named person accepts it.
Six jobs
Described by the work it does, not by the model behind it. Each job writes items to the bid record that your team accepts, edits or rejects.
Scope, exclusions, deadlines, qualification criteria and deliverables, each as one item with its volume, clause and page.
→ Requirements registerLDs, performance guarantees, time bars, payment and security terms, and conflicts between volumes, schedules and corrigenda.
→ Risk register, deviation scheduleEquipment schedules, drawing tags and specification clauses lined up with BOQ lines; gaps and mismatches go to the estimator.
→ BOQ reviewSub-RFQ replies compared on scope coverage, exclusions, delivery and price, then carried into the estimate you approve at G2.
→ Levelling sheetWritten from the approved record and your knowledge bank, so the proposal says what the team decided rather than what a model guessed.
→ Compliance matrix, technical volumeReads the draft contract against your qualifications and negotiated position, clause by clause, before signature.
→ Drift reportEvidence rules
The difference between a helpful summary and a bid record is discipline about evidence. These rules are built into how bidPlan stores and shows every AI finding.
Every finding links to the page, clause or drawing region it came from. If the evidence is missing, bidPlan says so instead of filling the gap.
"The tender does not mention it" and "the tender excludes it" are different answers, and bidPlan keeps them apart.
When a corrigendum changes a value, both values appear with the precedence rule that applies. Upload date never decides which one wins.
Quantities and units go to deterministic calculators. The operands and formula version are stored with the answer.
Coverage shows every page and section with a status. If a material section is unresolved, the review is labelled partial.
Findings stay proposals until a named owner accepts, edits or rejects them. The decision, not the suggestion, goes on the record.
Drawings
bidPlan reads sheet numbers, titles, revisions, legends and equipment tags from PDF, DWG and DXF drawings, and links them to schedules and BOQ lines.
Sheet register with revisions · equipment and tag lists · links from drawing tags to spec clauses and BOQ lines · flags where a drawing and a schedule disagree
Printed dimensions and native CAD geometry first; never infers an exact dimension from a raster image when a better source exists
Certify quantity take-off, verify engineering design, or interpret 3D models without review. Your estimator confirms the quantities.
Deployment
For owners and EPCs who cannot send tender documents outside the company, bidPlan is building an offline deployment: document processing, retrieval and language models run on your own servers, and the tender never leaves your network.
Security and deployment optionsHosted in-region, single sign-on, envelope-B controls and a full audit log.
On your GPU server, for tender packs of 2,000+ pages. Pilot sizing: 10 named users.
Test the AI on your tender
You get the requirements register, risk flags and BOQ review in 48 hours, each item linked to its source, and a session to go through it with your team.
Discuss your tenderHome / Why bidPlan / How bidPlan compares
How bidPlan compares
EPC bid teams already use four kinds of software, plus AI chat. Each is good at one moment of the bid. This page shows where each one stops, and what bidPlan does in the space between them.
The map
Across: how much of the journey from discovering a tender to signing the contract a category covers. Up: how deeply it understands EPC engineering and commercial work. Arrows show where categories are heading.
Category by category
Each category is named with the products EPC bid teams most often tell us they use. Positions on the map are our judgment from vendor sites and reviews.
They write the proposal. bidPlan builds the bid behind it.
Answering RFPs, questionnaires and PQQs from a content library, and drafting narrative sections.
At submission. No take-off, BOQ, vendor quotes, approved price or contract. Built for sales RFPs, not two-envelope EPC tenders.
Usually replaced for EPC bids: bidPlan drafts the compliance matrix and volumes from the approved record.
They find and summarise the tender. bidPlan decides, prices and stands behind it.
Finding tenders across portals, scoring fit, summarising documents and, increasingly, drafting responses.
Before the price. No estimate build-up, envelope control, signed gates or contract comparison.
Kept as the feed. Bring the tender service you already pay for; bidPlan picks up where the alert ends.
They build the estimate. bidPlan ties it to the clause and the contract.
Take-off, cost estimating, benchmarks and subcontract tendering, deep in one step of the bid.
At the estimate. They don't read the client's tender for risk, run bid / no-bid, release both envelopes or check the contract.
Often kept and connected. Their quantities and costs feed the bidPlan record and G2 approval.
They run the project. bidPlan hands them the contract you actually bid.
Running the project after award: schedules, document control, correspondence, cost and progress.
They start after award. Some score the bids you receive from vendors, but none hold the bid you made to your client.
Kept and fed. bidPlan hands over the baseline they run: assumptions, deviations, obligations and guarantees.
Keep the chat. bidPlan keeps the bid it produces. See the comparison
Reading documents, answering clause questions and drafting quickly. Already on most estimators' desks.
Keeps nothing shared: no record, no gates, no price trace, no envelope control, no link to the contract.
Keep it for email and one-off questions. Use bidPlan for anything the business has to stand behind.
Capability matrix
Each category is rated on its strongest typical product. Delivery gets a half mark for bidPlan because it hands over to your project system after the contract baseline.
| Category | Discover tenders | Qualify & analyse | Take-off & BOQ | Estimate & price approval | Supplier quotes | Proposal | Envelope control | Bid → client contract | Delivery | EPC sector depth | Score |
|---|---|---|---|---|---|---|---|---|---|---|---|
| bidPlan | 9.5 | ||||||||||
| Estimating & procurement | 4 | ||||||||||
| Tender intelligence | 3.5 | ||||||||||
| General AI chat | 3.5 | ||||||||||
| Delivery, CDE & PM | 2.5 | ||||||||||
| Response tools & AI writers | 1.5 |
Core = 1 point, partial = ½. Ratings are our judgment from public vendor sites and reviews, October 2026. Only bidPlan has envelope control and the bid-to-client-contract link. Sector depth for bidPlan reflects the Water & Wastewater pack; the Modular & Electrical and General EPC packs are in early access and pilot.
Keep, connect, replace
Portal coverage and alerts
Everything after the alert: decision, price, envelope, contract
Detailed quantity and rate work
Clause-to-BOQ trace, G2 approval, contract check
Running the project after award
The baseline it runs from, with obligations and guarantees
Non-EPC questionnaires
Compliance matrix and volumes from the approved record
Email, quick questions
A shared, signed record of what the team decided
Nothing on the bid path
One record with owners, versions and signatures
Chat assistants read tenders and draft well. But an EPC bid is a dozen people's decisions on scope, price and risk, and they must still hold when the contract is signed and the plant is tested. A chat keeps none of that.
Questions clients ask
Usually not. bidPlan links your estimate to the clauses that created it and the contract that follows. Detailed quantity and rate work can stay where your estimators are productive.
Ask where the price is approved, who can see envelope B, and how the client's draft contract is checked against what you bid. Those three answers are where bidPlan is built to be different.
It can, but it is built for engineering, procurement and construction tenders with quantities, guarantees and contract terms. For sales questionnaires, a response tool is a better fit.
Compare on your own tender
Then ask both the same questions: which BOQ lines did the corrigendum change, who accepted the LD-cap deviation, and where does the draft contract differ from your qualifications.
Discuss your tenderHome / Why bidPlan / ROI calculator
ROI calculator
In EPC the larger number sits in the price and the contract: a guarantee priced right, a deviation not given away, a drift caught before signature.
bidPlan assumptions, held fixed: 15% of post-award leakage recovered, +1.5 points on win rate, 25% less effort per bid, 10% of bids stopped at G1. Price is indicative; final pricing depends on users, packs and deployment.
Every bidPlan assumption halved. The expected case is shown below.
Returns are estimates from your inputs and the fixed assumptions on the left. A 48-hour readout on one live tender is the best test of them.
Discuss your tenderSecurity and deployment
EPC bids carry pricing, margins, vendor quotes and negotiation positions. bidPlan controls who sees them per bid and per role, records every change, and keeps the data in the region you choose.
Five questions for your CIO
Many estimators already paste tenders into AI chat. These are the questions that separate a convenient chat from a system of record.
| Question | Personal AI chat accounts | Business AI chat plans | bidPlan |
|---|---|---|---|
| Are our tenders used to train models? | Depends on each user's settings | Not by default | No. Your data trains nothing outside your tenant |
| Who in the company sees envelope B? | Anyone the file or chat reaches | Workspace roles; nothing per bid | Only the roles you name on that bid |
| Who changed the price, and when? | No record | Chat logs on enterprise tiers | Every change and gate signature, by name and time |
| What if the estimator leaves? | His chats leave with him | Access removed; reasoning stays in his chats | His assumptions stay on the bid |
| Can the data stay in India or the GCC? | No choice | Options on some enterprise plans | India and GCC regions, or on your own servers |
Chat-plan answers reflect provider terms as published in October 2026; check current terms before relying on them.
Controls
Envelope-B access is set per opportunity. Estimators can build costs without seeing final margin; the commercial view is limited to the roles you name.
Edit rights follow the role: Bid Manager, discipline leads, Estimating, Procurement, Commercial, Contracts, Project Director, MD and more.
G1 to G6 are signed by named people.
Every edit, acceptance, rejection, export and price view is logged with user and time, and kept with the bid.
Sign in with your company identity provider, such as Microsoft Entra ID, so leavers lose access the day they leave.
Each company's tenders, prices and knowledge bank are isolated. Retrieval is filtered by project and revision before anything reaches a model.
Deployment
Two ways to run bidPlan, with the same record, gates and controls.
Managed by Aptagrim, hosted in-region for India and the GCC. Updates, backups and monitoring included.
Runs on your servers with no outside connection. Document processing, search and language models are local; the tender never leaves your network.
Home / Resources
Resources
Checklists and tests built from how EPC bid teams actually decide. Use them on paper first; they map one-to-one onto bidPlan's gates.
Working papers
Request any paper by email and we send the PDF. No sales sequence attached.
Strategic fit, qualification readiness, capacity and risk, scored before you commit bid effort.
Technical ambiguity, commercial qualifications, contractual exposure and missing information.
Quantities, interfaces, exclusions, assumptions and vendor coverage before final pricing.
Home / Discuss your tender
Bring one live tender
The fastest way to judge bidPlan is on a tender your team is bidding now. We run it through the platform and walk you through what it found, page by page.
Discuss your tender
Your details first, then three quick questions about how your tender process runs today. Under two minutes.
Your detailsStep 1 of 4
Your request has been received
Copy it and email it to sales@bidplan.ai. We reply within one working day with a time and a secure upload link.
Your tender friction score
Scheduling sends your details and answers securely to the bidPlan team, then opens the booking page.
If you continue
Users, roles and your industry pack configured; past RFQs and proposals imported to your knowledge bank.
Bid / no-bid scoring, compliance rules, approval gates and drafting tuned to how your team bids.
Your team takes a real opportunity from intake to submission on bidPlan, with us alongside.